Temporary Shelter

The details location of accommodation centers & arrangement of water supply

Location of the Pilgrim Center Arrangement of Water supply
Talabania Four nos. of drinking water pavilion of permanent nature have been constructed and water can be supplied 24 hours. Fifty nos. of temporary stand posts will be opened during the period.
SCS staff colony 15 Nos. PVC tanks to be connected from existing water supply system
Kumbharapada out post 4 Nos. PVC tanks will be filled up through dedicated Production well and provision of one H.P. Tube Well.
Gundicha Mandir (Bus Stand) 3 Nos. PVC tanks to be connected from existing water supply system
Bagala Dharmasala 3 Nos. PVC tanks to be connected from existing water supply system
Jagannath Ballav 1 Nos. PVC tanks to be connected from existing water supply system
OSRTC (Narendra Kona) 2 Nos. PVC tanks will be filled up through dedicated Production well and provision of one H.P. Tube Well.
Aquarium 2 Nos. PVC tanks will be filled up through dedicated Production well and provision of one H.P. Tube Well.
BNR front 10 Nos. PVC tanks to be connected from existing water supply system
Sunar Gouranga 2 Nos. PVC tanks to be connected from existing water supply system
Bank of Baroda front 1 Nos. PVC tanks to be connected from existing water supply system
B.S High School 2 Nos. PVC tanks to be connected from existing water supply system
Ayurvedic College 1 Nos. PVC tanks to be connected from existing water supply system
Zilla School 3 Nos. PVC tanks to be connected from existing water supply system
SCS College ( Inner Field) 8 Nos. PVC tanks to be connected from existing water supply system
Florish India 2 Nos. PVC tanks will be filled up through dedicated Production well and provision of one H.P. Tube Well.
ODESA Bhawan Side 2 Nos. PVC tanks to be connected from existing water supply system
Gadadhar High School 1 Nos. PVC tanks to be connected from existing water supply system
Baseli sahi P.S 1 Nos. PVC tanks to be connected from existing water supply system
Chhapan Chhak 2 Nos. PVC tanks to be connected from existing water supply system
Nilachala Ashok 2 Nos. PVC tanks will be filled up through dedicated Production well and provision of one H.P. Tube Well.
Holiday Resort (Back Side) 4 Nos. PVC tanks will be filled up through dedicated Production well and provision of one H.P. Tube Well.
Digabareni 4 Nos. PVC tanks will be filled up through dedicated Production well and provision of one H.P. Tube Well.
Jatrika 2 Nos. PVC tanks will be filled up through dedicated Production well and provision of one H.P. Tube Well.
Along Beach Mayfair to Nilachal Ashok 30 Nos. PVC tanks will be filled up through dedicated Production well and provision of one H.P. Tube Well.

Water tankers Deployment Points

Badadanda

  • Shree Jagannath temple office
  • Srikrushna Cinema Gali
  • Near Indian Bank Gali
  • marchikot Chaka
  • Near Town Thana
  • Near market Chaka
  • Near Mausi Maa Mandir
  • Balagandi chak
  • Near Medical Chaka
  • Near Badasnkha
  • Near Sangram Club
  • Near Gundicha Temple

Sea Beach

  • Penthakata (SJSV Chhaka)
  • Penthakata (Near Hotel Santana)
  • Hotel Holiday Resert
  • Hotel Chanakya BNR
  • Subash Bose Chaka
  • harihar Chaka
  • Digabareni Khunti
  • Near Puri Hotel
  • Renuka Gali
  • Chaitanya Chaka
  • Near Swarga Dwara
  • Hotel New Sea Hawk
  • Hotel SUV Palace
  • Near Light House
  • Near Hotel Sanar Bangala

Other Junction Place

  • Near Hotel Raj Palace (Totagopinath)
  • Baliapanda
  • Lokannath Road
  • Near Krushtashram Chhak
  • Narendrakona Mangala Mandir
  • JAtiababaji Chhak
  • Atharnala
  • Matiapada Chaka
  • Puri – Konark road Railway Gate
  • Near Balighat Chaka
  • Ashram Chhaka
  • Railway Station
  • Near CESU Division Office
  • hadeswari Chaka
  • Near Zilla School
  • SCS College Chaka
  • Town Hall Chaka
  • Mochisahi Chaka

One AE & Six Staff shall remain in charge of functioning of water tankers.